62. Making Beam Shelves / Sheer Clamps

In this episode I start by adjusting the position of some of the frames, and fairing them all on the inside. Then I cut and fit the scarph joins on the big 6-1/2” x 3” Angelique timbers. Along the way, I do a stress test on the 28’ long beams by parking a vehicle over each end, and jacking up the middle with a 20 ton bottlejack. The chickens and Pancho the parrot lark around as usual.


Donate securely with PayPal – GBP


Donate securely with PayPal – USD



For sneaky preview of what’s going on in between Episodes, follow my Facebook and Instagram.

To become a PATRON, visit My Patreon Page

To see all the other ways you can support the project, visit the Support Tally Ho Page

To contribute tools or other items to help the project, see my Tally Ho’s Rebuild Wishlist

My Youtube Channel

Music;
Joey Pecoraro – Russian Dance
Bad Snacks – The Morning After
Chris Haugen – Morning Mandolin
Midnight North – Sunny Looks Good on You
Eveningland – Can’t Sleep
Joey Pecoraro – Jazz Mango
Otis McDonald – Complicate Ya


62. Making Beam Shelves / Sheer Clamps (Tally Ho EP62)

4 thoughts on “62. Making Beam Shelves / Sheer Clamps

  1. I just have some suggestions about how you can get those beam clamps into the boat.
    First, since they will be extremely long if you bolt/glue them together, I think it would be easier to hoist them up separately before you bolt /glue them together. Smaller pieces will be easier to handle.
    Second, since you do have a fork lift, you can lift them up to the level of the cross beams connecting your boat ribs. Then you can slide them off the forks, and use rollers to roll them onto the cross beams, on both the starboard and port sides. Rollers are easy to build out of PVC pipe, with end caps and metal electrical conduit for the axle. Once the beam sections are up on those cross beams, then you can bolt /glue them together.
    Anyway, I’m looking forward to your methods of construction. It’s a fantastic project so far, and excellent work.

Comment...